Summary (Selected Highlights From DEP Documents)
- USE: Metal Plating and Finishing
- RESULT:
- Pioneer Metals- files show last activity from DEP on 10/15/04 when a letter
was sent to Pioneer giving them conditional approval based on an amended Remedial
Investigation Work Plan report dated March 2004 and August 23, 2004, submitted by
Malcolm Pirnie Engineering on behalf of Pioneer.
- The amended RIWP proposes additional soil/sediment samples, surface water
sampling, redeveloping existing wells, installing and sampling of two additional wells.
- A field reconnaissance was to be conducted and Pioneer was to notify the DEP
prior to field activities so that the DEP could be present.
- Malcolm Pirnie Engineering in their RIWP dated March 2004 to the DEP proposed
a schedule of events starting May 2004 through July 2009.
- Notice of Violation dated 03/08/2007 was sent to Pioneer Metals regarding
Remedial Investigation Workplan Deficiencies.
-
Pioneer Metals
Contact Information:
Fred Trotz-Pioneer Metals Finishing, Inc. (responsible party)
P.O. Box 387, Coles Mill Rd., Franklinville, NJ. 08322